Songdo CENTRAL PART I & II

Project Description:

Duration: Nov, 2005 ~ May, 2007

Location: Incheon, Republic of Korea

Design:

1. Foreign; HOK (USA)

2. Domestic; Dong IL Architects (ROK)

Construction: Posco E & C

Size:

  • 43 Story 2 Units,

  • 46 Story 3 Units,

  • 49 Story 1 Unit

        

Scope of Services:

Design;

  • Review of Façade system

  • Schematic Design

  • Review of Design Load

  • Review of Basic Budget

  • Value Engineering

  • Construction Documents

Construction Administration;

  • Value Engineering

  • Tender Review

  • Mock-up Review

  • Shop drawings Review

  • Factory Inspection report

  • Site Inspection

  • Final Report