top of page

Songdo CENTROAD

Project Description:

Duration: 2008 ~ 2009

Location: Incheon, R.O.K.

Design: Gansam/Heerim (ROK)

Construction: Posco E & C

Size: 33 Story

Scope of Services:

Design;

  • Review of Façade system

  • Review of Design Load

  • Review of Basic Budget

  • Value Engineering

  • Construction Documents

Construction Administration;

  • Value Engineering

  • Tender Review

  • Mock-up Review

  • Shop drawings Review

  • Factory Inspection report

  • Site Inspection

  • Final Report

 

bottom of page