top of page

Songdo E5

Project Description:

Duration: Aug 2008 ~ Sep 2010

Location: Kyunggi Province, Republic of Korea

Design:

  1. Foreign; NBBJ

  2. Domestic; Dong Il

Construction: Posco E & C (ROK)

Size: 96,570 s/m, 40 Story

        

Scope of Services:

Design;

  • Review of Façade system

  • Schematic Design

  • Review of Design Load

  • Review of Basic Budget

  • Value Engineering

  • Construction Documents

 

 

bottom of page